Sign In | Join Free | My uabig.com
China Beijing Zulin Formwork & Scaffolding Co., Ltd. logo
Beijing Zulin Formwork & Scaffolding Co., Ltd.
Beijing Zulin Formwork & Scaffolding Co., Ltd. ---Formwork and scaffolding solution
Verified Supplier

14 Years

Home > Concrete Column Formwork >

Adjustable Semi-diameter Arced Concrete Column Formwork for curved wall

Beijing Zulin Formwork & Scaffolding Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Adjustable Semi-diameter Arced Concrete Column Formwork for curved wall

Model Number : Arced Formwork. KTYH

Place of Origin : Beijing, China (Mainland)

Brand Name : ZULIN

Certification : ISO9001-2008

Price : Negotiation

MOQ : One 20ft container

Delivery Time : After deposit 15-20 days

Payment Terms : T/T L/C (bank transfer)

Supply Ability : 100sets/day

Packaging Details : In bulk,pallet,bundle or according the customer demand

Contact Now

Adjustable Semi-diameter Arced Concrete Column Formwork for curved wall

Descrition:

It can be used for any curved wall with the semi-diameter longer than 1.10m

Adjustable acted Formwork Profile
Adjustable Semi-diameter Arced Formwork On the basis of the foreign company technology, we developed the

Adjustable Semi-diameter Arced Formwork, which can be used for any curved wall with the semi-diameter

longer than 1.10m. Traditionally, the formwork is produced in accordance with the designed semi-diameter,

which is one-off use, causing much material wasting. All the defects of the traditional formworks are overcome

after we developed the Adjustable semi-diameter arced formwork. Also, we lease the formwork out to the contractors

to save their cost, which proves good effect.
Adjustable acted Formwork's panel is 18mm Plywood,because the panel specification is 2440×1220 mm,so the formwork

max width is 2440mmUpright rib is combination steel frame ,the panel and the steel frame is connected by bolt ;

Horizontal rib is short Double-side V-iron , there are adjustable connectors between V-iron.Upright side-rit is angle steel .

The radius can be regulated at any time when meet to different section. Adjustable Acted Formwork Technique parameter:
Allowed Load50-70KN/M2 Per square meter65KG

Advantage of the product
Can be adjusted to any curved wall with a semi-diameter longer than 1.1m
Easy and quick operation.
Low cost and wide use.
High standard elements.
Assembly procedure
1. Assemble timber beam and timber connector.
2. Assemble plywood and edge rib.
3. Assemble adjustable system.
4. Assemble connecting waling.
5. Adjust the formwork, make the formwork bent into designed radius.
6. Connect every module by adjustable steel clamp.


One plan sketch is shown below



Product Tags:

steel column formwork

      

formwork for column

      
Wholesale Adjustable Semi-diameter Arced Concrete Column Formwork for curved wall from china suppliers

Adjustable Semi-diameter Arced Concrete Column Formwork for curved wall Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Beijing Zulin Formwork & Scaffolding Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)